Full bathroom renovation including plumbing, permits, and tile handled by one crew. We own the project from the first tear-out to the final inspection.
AAA NY Contracting Corp is a licensed bathroom renovation company handling full bathroom remodels in the Bronx and throughout NY. We manage design, demolition, plumbing, tile, fixtures, and permitted work, completed on schedule.
Quotes are free and come with no obligation, so there’s no downside to finding out what your project actually costs.
A bathroom job is never just one trade. You’ve got plumbing, electric, tile, waterproofing, and half the time a permit application sitting in the middle of all of it. Most homeowners’ worst experience isn’t any single part going wrong, it’s the plumber blaming the tiler and the tiler blaming whoever forgot to file the permit. We keep one crew on the job start to finish so there’s nobody to point fingers at but us.
We work all over the Bronx including Riverdale, Pelham Bay, Morris Park, Throggs Neck, Kingsbridge, Fordham, Parkchester.
A lot of these neighborhoods have older buildings, and older buildings usually mean plumbing and wiring behind the wall that hasn’t been touched in decades. We check what we’re dealing with before we open up the wall, not after we’re already committed to a timeline.
Some bathrooms need everything torn out and rebuilt. Others just need one thing fixed. We handle both ends, from a compact powder room to a full master bathroom renovation.
The layout stops working, so everything comes out. Subfloor, fixtures, old tile, all of it, and we rebuild from there.
The single most requested job we get in Bronx bathrooms. An aging parent can’t step over the tub safely, or someone just wants the floor space back. We handle the pan, the waterproofing membrane, and the drain relocation if the footprint shifts.
We build to your actual footprint, not a prefab unit that almost fits. That matters most in a small bathroom remodel, where the fixture layout decides what’s possible before budget ever does.
New supply and waste lines go through DOB review first. The tile goes down after that’s settled, not before.
For a parent or spouse who needs the room to work differently now. That might mean grab bars and a wider doorway. It might mean a full walk-in tub and a curbless shower. We build to what the person actually needs, not a standard package.
The shower pan and membrane matter more than the tile on top of it. Get that layer wrong, and a leak won’t show up in your bathroom right away. It shows up in the ceiling below, usually about a year later, once it’s much harder to trace back to the source.
(914) 912-1067
Moving a toilet, tub, or sink to a new spot in the room needs a DOB plumbing permit and a licensed master plumber’s sign-off. Keeping fixtures where they already are and swapping finishes usually doesn’t. Our bathroom remodeling contractors figure out which category your bathroom falls into during the site visit. That happens before we give you a number, while the walls are still closed.
If you’re in a co-op or multi-family building, we coordinate the water shut-off with the building ahead of demo day, not the morning of. We handle that conversation directly with your managing agent or super, so it’s already arranged before our crew shows up. That coordination is built into your timeline and quote from day one.
As your bathroom contractor in the Bronx, we keep every step under one roof. Seven steps get you from a torn-out bathroom to a finished one, roughly in this order:
A standard Bronx bathroom remodel runs 2 to 4 weeks from demo to final walkthrough, longer if the layout is changing or a permit is involved. We’ll tell you which applies before we ever hand you a number.
Call (914) 912-1067 or click the button below to have us come out, walk the space, and tell you exactly what it’s going to cost.
It depends on scope. A cosmetic refresh costs far less than a full gut with a layout change, and a tub-to-shower conversion sits somewhere in between. We give you a firm number after seeing the space, so the estimate holds up once work starts.
Plan for two to four weeks. If your building requires extra steps for permits, that adds time. We'll tell you exactly what the hold-ups might be when we come out to look at the room.
If the toilet or tub is moving, yes, we need a DOB plumbing permit and a licensed master plumber's sign-off. If we're keeping things where they are and just changing the tile, we usually don't need one. We'll check your setup on day one so you don't run into trouble with the city.
Yes. We handle the demo, the pan, the waterproofing membrane, and any drain relocation the new footprint requires.
Yes. The shower pan and membrane go in before any tile. That layer, not the finish tile, is what actually keeps water from reaching the ceiling below.
Yes. Grab bars, walk-in tubs, wider doorways, curbless showers, built for whoever needs the bathroom to work differently now.
A New York general contractor with twenty years of permits pulled and violations cleared across all five boroughs. We’re the firm you call when you need the paperwork done right and the construction held to a higher standard.
Copyright © 2026. All rights reserved.